We are proud to introduce you to our new manufacturing plant and offices in Schio (Vicenza, Italy).
- Construction completed in 2020, fully operational since April 2021
- 5.600 sqm workshop area, exclusively dedicated to welding exotic materials and therefore without carbon steel contamination
- Total area 10.200 sqm
- More than 30 Ton lifting capacity per line
- 11 cranes with 15/20 Ton capacity
- 3 working lines
- Tallest line: 8,5 mt below the crane hook